Pittsburgh International Airport

CTE provided complete preliminary and final design for the rehabilitation of Runway 10L/28R and the rehabilitation of Taxiways F and P. As part of this assignment, CTE conducted a pavement evaluation and submitted a report recommending the most economical rehabilitation method. CTE's recommendation and design for Runway 10L/28R included milling and overlaying approximately 7,000 feet of 6-inch bituminous concrete pavement, including high speed turnouts; transformer and lamp replacement of runway shoulder lighting, including upgrades to meet FAA requirements; and crack and joint repairs. CTE also prepared estimates of cost for this design work and developed construction phasing plans which maintained efficient airport operations during construction.

Client
Allegheny County Airport Authority

Location
Pittsburgh, PA

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer